top of page
Sentinel Electric white logo
In compliance with PRC - 005 NERC reliability requirements

Sentinel Electric Inc. provides testing and commissioning services to utilities for their protection and control projects. On a typical project (apparatus change out or relay protection upgrade), Sentinel Electric Inc. will dedicate a Commissioning Engineer to prepare, oversee, test and install those components and systems. Our Commissioning Engineers are experienced in commissioning of greenfield projects as well as modifications. Some of the Commissioning Engineer’s responsibilities are to review the design drawings, develop and execute test plans provide technical direction to the protective relay engineer, equipment specialist and control board wiremen, and perform final in-service checks when bringing the equipment online for the first time. To learn more about our substation testing, contact us today.

Electrical Substation Testing

Electrical Substation Testing

In compliance with PRC - 005 NERC reliability requirements

Sentinel Electric Inc. provides testing and commissioning services to utilities for their protection and control projects. On a typical project (apparatus change out or relay protection upgrade), Sentinel Electric Inc. will dedicate a Commissioning Engineer to prepare, oversee, test and install those components and systems. Our Commissioning Engineers are experienced in commissioning of greenfield projects as well as modifications. Some of the Commissioning Engineer’s responsibilities are to review the design drawings, develop and execute test plans provide technical direction to the protective relay engineer, equipment specialist and control board wiremen, and perform final in-service checks when bringing the equipment online for the first time. To learn more about our substation testing, contact us today.

Gemini_Generated_Image_is49s0is49s0is49.png
Protective Relays 1
  • Setting, testing and calibration of electro-mechanical type relays

  • Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler

  • “End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

20230314_151844_edited.jpg
Power Line Carrier 2
  • Line Traps

  • Line Tuners

  • Transmitters and Receivers

  • “End to End” system testing

Gemini_Generated_Image_Functional Testing.png
Functional Testing 3
  • Circuit verification of AC and DC circuits from schematics, three-lines, one-lines and manufacturer drawings

Gemini_Generated_Image_4x6uo74x6uo74x6u.png
Power Circuit Breakers 4
  • Breaker timing, velocity, voltage withstand and contact resistance

Gemini_Generated_Image_6q1zxy6q1zxy6q1z.png
Power Transformers 5
  • Power Factor (Doble)

  • Transformers Turns Ratio (TTR)

  • Winding resistance

  • Megger

  • Verification of:  operation of the rapid pressure rise relay, nitrogen system alarms, temperature monitor system, oil level system and testing of the annunciator

Gemini_Generated_Image_o9srh4o9srh4o9sr.png
Current Transformers 6
  • Ratio

  • Polarity

  • Saturation

Gemini_Generated_Image_emaemjemaemjemae_edited.jpg
Coupling Capacitator Voltage Transformers (CCVT) 7
  • Power Factor (Doble)

  • Ratio

  • Megger

Gemini_Generated_Image_crjz68crjz68crjz.png
Motor Operated Disconnects (MOD) 8 
  • Setup, functional and contact resistance

20230314_151358.jpg
Station Battery & Charger 9
  • Discharge Tests

  • Impedance Tests

  • Specific Gravity, voltage and contact resistance of straps

  • Verification of battery charger float and equalize voltages, current limit, output alarms and wiring

Gemini_Generated_Image_4vvcn44vvcn44vvc.png
Meters 10
  • Kwh (money meter), as well as, panel board and transducer testing

Gemini_Generated_Image_okeyquokeyquokey.png
Cables 11
  • Hipot and/or Megger

Gemini_Generated_Image_3rpogu3rpogu3rpo.png
Control Power Wiring 12
  • Terminate cables, modify internals to new design

Gemini_Generated_Image_emaemjemaemjemae_edited.jpg
Ground Grid 13
  • Three Point fall of potential method and test all stingers

Gemini_Generated_Image_hj45m8hj45m8hj45.png
Project Management 14
  • On site project management and quality assurance.  Providing expertise in correct installation and knowledge of devices.

protective relay

Protective Relays

  • Setting, testing and calibration of electro-mechanical type relays

  • Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler

  • “End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

protective relay

Protective Relays

  • Setting, testing and calibration of electro-mechanical type relays

  • Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler

  • “End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

power line carrier

Power Line Carrier

  • Line Traps

  • Line Tuners

  • Transmitters and Receivers

  • “End to End” system testing

power line carrier

Power Line Carrier

  • Line Traps

  • Line Tuners

  • Transmitters and Receivers

  • “End to End” system testing

protective relay

Protective Relays

  • Setting, testing and calibration of electro-mechanical type relays

  • Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler

  • “End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

power line carrier

Power Line Carrier

  • Line Traps

  • Line Tuners

  • Transmitters and Receivers

  • “End to End” system testing

grid sticky image copy- protective relay.jpg

Protective Relays

  • Setting, testing and calibration of electro-mechanical type relays

  • Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler

  • “End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

power line carrier

Power Line Carrier

  • Line Traps

  • Line Tuners

  • Transmitters and Receivers

  • “End to End” system testing

electrical power lines

Functional Testing

  • Circuit verification of AC and DC circuits from schematics, three-lines, one-lines and manufacturer drawings

protective relay

Protective Relays

  • Setting, testing and calibration of electro-mechanical type relays

  • Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler

  • “End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Electrical substation
  • Acceptance Testing

  • Substation Commissioning

  • New & Existing Installations

  • Technical Project Management

Electrical Substation

Testing

Start Now

Electrical Substation

Testing

image.png
  • Acceptance Testing

  • Generation Commissioning

  • New & Existing Installations

  • Technical Project Management

Power Generator Station Testing

Start Now

Power Generator Station Testing

Gemini_Generated_Image_egltt6egltt6eglt.png
  • Dedicated Commissioning Engineer

  • System Oversight & Preparation

  • Component Testing & Installation

  • Full System Integration

Project

Management

Project

Management

electrical station
  • Electrical Testing & Maintenance

  • Design Drawing Review

  • Test Plan Execution

  • Precision & Value Engineering

All Services

 

Start Now

All Services

  • Setting, testing and calibration of electro-mechanical type relays

  • Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler

  • “End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Protective Relays 1

protective relay

Power Line Carrier 2

  • Line Traps

  • Line Tuners

  • Transmitters and Receivers

  • “End to End” system testing

power line carrier
electrical power lines

Functional Testing 3

  • Circuit verification of AC and DC circuits from schematics, three-lines, one-lines and manufacturer drawings

power circuit breaker

Power Circuit Breakers 4

  • Breaker timing, velocity, voltage withstand and contact resistance

power transformer

Power Transformers 5

  • Power Factor (Doble)

  • Transformers Turns Ratio (TTR)

  • Winding resistance

  • Megger

  • Verification of:  operation of the rapid pressure rise relay, nitrogen system alarms, temperature monitor system, oil level system and testing of the annunciator

current transformers

Current Transformers 6

  • Ratio

  • Polarity

  • Saturation

Coupling Capacitator Voltage Transformers

Coupling Capacitator Voltage Transformers (CCVT) 7

  • Power Factor (Doble)

  • Ratio

  • Megger

motor operated disconnects

Motor Operated Disconnects (MOD) 8

  • Setup, functional and contact resistance

station battery and charger

Station Battery & Charger 9

  • Discharge Tests

  • Impedance Tests

  • Specific Gravity, voltage and contact resistance of straps

  • Verification of battery charger float and equalize voltages, current limit, output alarms and wiring

meters

Meters 10

  • Kwh (money meter), as well as, panel board and transducer testing

electrical substation cables

Cables 11

  • Hipot and/or Megger

control panel wiring

Control Panel Wiring 12

  • Terminate cables, modify internals to new design

ground grid

Ground Grid 13

  • Three Point fall of potential method and test all stingers

electrical inspector

Project Management 14

  • On site project management and quality assurance.  Providing expertise in correct installation and knowledge of devices.

In compliance with PRC - 005 NERC reliability requirements

Sentinel Electric Inc. provides testing and commissioning services to utilities for their protection and control projects. On a typical project (apparatus change out or relay protection upgrade), Sentinel Electric Inc. will dedicate a Commissioning Engineer to prepare, oversee, test and install those components and systems. Our Commissioning Engineers are experienced in commissioning of greenfield projects as well as modifications. Some of the Commissioning Engineer’s responsibilities are to review the design drawings, develop and execute test plans provide technical direction to the protective relay engineer, equipment specialist and control board wiremen, and perform final in-service checks when bringing the equipment online for the first time. To learn more about our substation testing, contact us today.

Electrical Substation Testing

bottom of page