In compliance with PRC - 005 NERC reliability requirements
Sentinel Electric Inc. provides testing and commissioning services to utilities for their protection and control projects. On a typical project (apparatus change out or relay protection upgrade), Sentinel Electric Inc. will dedicate a Commissioning Engineer to prepare, oversee, test and install those components and systems. Our Commissioning Engineers are experienced in commissioning of greenfield projects as well as modifications. Some of the Commissioning Engineer’s responsibilities are to review the design drawings, develop and execute test plans provide technical direction to the protective relay engineer, equipment specialist and control board wiremen, and perform final in-service checks when bringing the equipment online for the first time. To learn more about our substation testing, contact us today.
Electrical Substation Testing
Electrical Substation Testing
In compliance with PRC - 005 NERC reliability requirements
Sentinel Electric Inc. provides testing and commissioning services to utilities for their protection and control projects. On a typical project (apparatus change out or relay protection upgrade), Sentinel Electric Inc. will dedicate a Commissioning Engineer to prepare, oversee, test and install those components and systems. Our Commissioning Engineers are experienced in commissioning of greenfield projects as well as modifications. Some of the Commissioning Engineer’s responsibilities are to review the design drawings, develop and execute test plans provide technical direction to the protective relay engineer, equipment specialist and control board wiremen, and perform final in-service checks when bringing the equipment online for the first time. To learn more about our substation testing, contact us today.

Protective Relays 1
-
Setting, testing and calibration of electro-mechanical type relays
-
Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler
-
“End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Power Line Carrier 2
-
Line Traps
-
Line Tuners
-
Transmitters and Receivers
-
“End to End” system testing

Functional Testing 3
-
Circuit verification of AC and DC circuits from schematics, three-lines, one-lines and manufacturer drawings

Power Circuit Breakers 4
-
Breaker timing, velocity, voltage withstand and contact resistance

Power Transformers 5
-
Power Factor (Doble)
-
Transformers Turns Ratio (TTR)
-
Winding resistance
-
Megger
-
Verification of: operation of the rapid pressure rise relay, nitrogen system alarms, temperature monitor system, oil level system and testing of the annunciator

Current Transformers 6
-
Ratio
-
Polarity
-
Saturation

Coupling Capacitator Voltage Transformers (CCVT) 7
-
Power Factor (Doble)
-
Ratio
-
Megger

Motor Operated Disconnects (MOD) 8
-
Setup, functional and contact resistance

Station Battery & Charger 9
-
Discharge Tests
-
Impedance Tests
-
Specific Gravity, voltage and contact resistance of straps
-
Verification of battery charger float and equalize voltages, current limit, output alarms and wiring

Meters 10
-
Kwh (money meter), as well as, panel board and transducer testing

Cables 11
-
Hipot and/or Megger

Control Power Wiring 12
-
Terminate cables, modify internals to new design

Ground Grid 13
-
Three Point fall of potential method and test all stingers

Project Management 14
-
On site project management and quality assurance. Providing expertise in correct installation and knowledge of devices.

Protective Relays
-
Setting, testing and calibration of electro-mechanical type relays
-
Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler
-
“End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Protective Relays
-
Setting, testing and calibration of electro-mechanical type relays
-
Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler
-
“End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Power Line Carrier
-
Line Traps
-
Line Tuners
-
Transmitters and Receivers
-
“End to End” system testing

Power Line Carrier
-
Line Traps
-
Line Tuners
-
Transmitters and Receivers
-
“End to End” system testing

Protective Relays
-
Setting, testing and calibration of electro-mechanical type relays
-
Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler
-
“End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Power Line Carrier
-
Line Traps
-
Line Tuners
-
Transmitters and Receivers
-
“End to End” system testing

Protective Relays
-
Setting, testing and calibration of electro-mechanical type relays
-
Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler
-
“End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Power Line Carrier
-
Line Traps
-
Line Tuners
-
Transmitters and Receivers
-
“End to End” system testing

Functional Testing
-
Circuit verification of AC and DC circuits from schematics, three-lines, one-lines and manufacturer drawings

Protective Relays
-
Setting, testing and calibration of electro-mechanical type relays
-
Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler
-
“End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology

Electrical Substation
Testing
Power Generator Station Testing

Project
Management
-
Setting, testing and calibration of electro-mechanical type relays
-
Setting and testing of micro-processor type relays, such as, Schweitzer, ABB, RFL, Beckwith, Multilin, GE, Siemens and Basler
-
“End to End” system testing utilizing Doble F6150 / Omicron 356 satellite technology
Protective Relays 1

Power Line Carrier 2
-
Line Traps
-
Line Tuners
-
Transmitters and Receivers
-
“End to End” system testing


Functional Testing 3
-
Circuit verification of AC and DC circuits from schematics, three-lines, one-lines and manufacturer drawings

Power Circuit Breakers 4
-
Breaker timing, velocity, voltage withstand and contact resistance

Power Transformers 5
-
Power Factor (Doble)
-
Transformers Turns Ratio (TTR)
-
Winding resistance
-
Megger
-
Verification of: operation of the rapid pressure rise relay, nitrogen system alarms, temperature monitor system, oil level system and testing of the annunciator

Current Transformers 6
-
Ratio
-
Polarity
-
Saturation

Coupling Capacitator Voltage Transformers (CCVT) 7
-
Power Factor (Doble)
-
Ratio
-
Megger

Motor Operated Disconnects (MOD) 8
-
Setup, functional and contact resistance

Station Battery & Charger 9
-
Discharge Tests
-
Impedance Tests
-
Specific Gravity, voltage and contact resistance of straps
-
Verification of battery charger float and equalize voltages, current limit, output alarms and wiring

Meters 10
-
Kwh (money meter), as well as, panel board and transducer testing

Cables 11
-
Hipot and/or Megger

Control Panel Wiring 12
-
Terminate cables, modify internals to new design

Ground Grid 13
-
Three Point fall of potential method and test all stingers

Project Management 14
-
On site project management and quality assurance. Providing expertise in correct installation and knowledge of devices.
In compliance with PRC - 005 NERC reliability requirements
Sentinel Electric Inc. provides testing and commissioning services to utilities for their protection and control projects. On a typical project (apparatus change out or relay protection upgrade), Sentinel Electric Inc. will dedicate a Commissioning Engineer to prepare, oversee, test and install those components and systems. Our Commissioning Engineers are experienced in commissioning of greenfield projects as well as modifications. Some of the Commissioning Engineer’s responsibilities are to review the design drawings, develop and execute test plans provide technical direction to the protective relay engineer, equipment specialist and control board wiremen, and perform final in-service checks when bringing the equipment online for the first time. To learn more about our substation testing, contact us today.